SAVANNAH, Ga. - The U. S. Army Corps of Engineers' Hartwell Lake Office will accept natural Christmas trees (no artificial trees) for recycling Dec. 26, 2020 through Jan. 26, 2021. Authorizes the Port of Oakland for the routine maintenance and repair activities necessary to maintain current Port facilities and navigational equipment. authorizes discharge of suitable material into the water bodies (man-made lakes, impoundments and ponds) in conjunction with the hydraulic or mechanical dredging or excavating of lakebed sediment that has accumulated in the water body over time. Authorizes bank stablization activities including those approved by Illinois Department of Natural Resources, Office of Water Resources. Authorizes Monterey Peninsula Water Management District to conduct mainteanance and restoraiton activities along 18.6 mile segment of the Carmel River. Authorizesall County, local city and town, and Tribal government entities within Pima County to conduct various maintenance and bank stabilization activities. RGP 26 Port of Oakland - Maritime Facilities Maintenance. Public Transportation Projects - Maintenance, repair, rehabilitation, and replacement of roads, culverts, bridges, and associated structures. Authorizes the construction of drainage and control structures, water level control structures, and grade and erosion control structures. development as shown on the attached plans subject to the rules and regulations of the corps of engineers on waters under the control of the u.s army, corps of engineers. storm debris, downed trees, and log rafts) for the purposes of maintaining drainage, (Staten Island "Blue Belt" extended stormwater detention facilities), structures and work in artificial tidal lagoons and access channels, NAO 19-RP-01 - Virginia Department of Transportation roadway and railway projects. 2016-00102/Savannah Rivers and Lakes South Carolina: 2016-00103/Savannah Rivers and Lakes South Carolina, Construction and Maintenance of Boat Ramps, 2016-00104/Savannah Rivers and Lakes South Carolina, 2016-00105/Savannah Rivers and Lakes South Carolina, 2016-00106/Savannah Rivers and Lakes South Carolina, South Carolina Lakes: Wylie (SC), Fishing Creek, Great Falls, Rocky Creek, Wateree, Keowee, Ninety-nine Island, Gaston Shoals, Robinson, Regional General Permit/2013-00660/Duke Energy General Permit: Fish Attractors, Reefs, Fishery Enhancement Activities, Heat Exchange Coils, Intake Pipes, Geothermal Use, Dry Hydrants, Lake Marion, Lake Moultrie, South Carolina, Erosion Control (Retaining Walls/Bulkheads/Groins), Erosion Control (Rip-Rap/Bio-Engineering), 2013-00644/South Carolina Gas & Electric Company, 2013-00645/South Carolina Gas & Electric Company. When lake levels return to normal, individuals are responsible for returning their docks to the permitted locations and removing all temporary anchor pins. 2013-00646/South Carolina Gas & Electric Company: 2013-00647/South Carolina Gas & Electric Company, 2013-00648/South Carolina Gas & Electric Company, 2013-00649/South Carolina Gas & Electric Company, 2013-00650/South Carolina Gas & Electric Company, 2013-00651/South Carolina Gas & Electric Company, 2013-00652/South Carolina Gas & Electric Company, 2013-00653/South Carolina Gas & Electric Company, 2013-00654/South Carolina Gas & Electric Company, 2013-00655/South Carolina Gas & Electric Company, 2013-00656/South Carolina Gas & Electric Company, Residential, Commercial and Institutional Developments, District portion of Illinois (District boundary in IL includes Cook, DuPage, Kane, Lake, McHenry and Will Counties), Aquatic Habitat Restoration, Establishment, and Enhancement, for activities in place of suspended NWP nos. Public Transportation Projects -Construction of new public transportation projects that will be part of the state transportation system; which is limited to State Routes, U.S. Authorizing Work and Activities in the Savannah River Lakes - recreational swim beaches for Lake Hartwell, Lake Russell and Lake Thurmond. Expiration dates are no longer printed on the new permit tags. RGP 5 Conduct protection activities under emergency situations. Programmatic Regional Permit-60: Minor Construction Activities on Entergy-Owned Arkansas Hydropower Lakes; Lake Catherine and Lake Hamilton. The U.S. Army Corps of Engineers (USACE), Regulatory program, regulates work and structures that are located in, under or over navigable waters of the United States under Section 10 of the. Members of the Hartwell staff are available to answer general questions, explain the permitting process, and/or arrange an on-site meeting to discuss permitting options. Regional General Permit for Stream Restoration Activities by the West Virginia Conservation Agency, Associated with discrete events triggering the issuance of an emergency declaration by the Governor of West Virginia, Regional General Permit for Abandoned Mine Lands Reclamation in the State of West Virginia, Abandoned Mine Lands Reclamation in the State of West Virginia, Regional General Permit for Ohio Department of Transportation projects, Huntington District is the single Corps POC for all ODOT projects, Regional General Permit for West Virginia Department of Transportation projects, Huntington District is the single Corps POC for all WVDOT projects. 3 Bank Protection of Cultural Sites, authorizes the construction of bank stabilization projects to prevent destruction of culturally significant sites, RGP 96-08-SD (No 199621008, Amendment No. U.S. Army Corps of Engineers Southwestern Division (SWD) has agreed with TCEQ to continue using the 2000 MOA Section 401 Certification Procedures, including the delegation for Tier I and Tier II projects, only for Corps permit applications received PRIOR to 11 September 2020.All applications received after this date will follow the Clean Water Act Section 401 Certification Rule procedures. Maintenance Dredging (Excavation) in Blue Ridge, Nottely, and Chatuge Reservoirs-authorizes maintenance dredging of accumulated sediment from previously authorized facilities located in waters of the United States. authorizes the construction, expansion, and extension of boat ramps and other activities related to boat ramps. 659, in Crisp, Dooly, Sumter, Lee and Worth Counties, in the State of Georgia. 1. the permittee shall adhere to the conditions for shoreline use set forth in appendix c of er 1130-2-406. i understand and agree to the conditions of the permit for shoreline use. Authorizes activities conducted in accordance with the terms and conditions of the Beach Creation and Nourishment Regional General Permit (RGP or permit) in the States of Wisconsin and Minnesota and on Indian Reservations in Wisconsin and Minnesota. Minor Structures and Activities in Portions of Lake Seminole, George W. Andrews Lake, Walter F. George Lake, West Point Lake, Lake Sidney Lanier, Carters Lake, and Altoona Lake Operated by Mobile Disctrict USACE Within the State of Georgia -Submerged irrigation lines in Navigable Waters of the United States. If the location in question has an old permit tag displayed with an expiration date on it, please disregard the date shown. ; debris removal; construction and maintenance of ski ramps fixed by temporary mooring devices such as retrievable, conventional anchors; fish havens, fish reefs, fishery enhancement, mariculture and aquaculture activities; construction of noncommerical intake structures; aerial transmission lines and submerged utility lines; maintenance of existing beaches; normal operation and maintenance activities associated with FERC Project No. In June, the South Atlantic Division announced dock fees would increase to $835 beginning on Jan. 1, 2020. For website corrections, write to sas-cco@usace.army.mil, An official website of the United States government, National Environmental Policy Act and Planning Process, Effects Determination Guidance for Endangered & Threatened Species (EDGES), Hosted by Defense Media Activity - WEB.mil. Missouri. Impacts are limited to 500 linear feet of stream, and/or 2.0 acres of wetland and other waters of the U.S.; which includes areas that are mechanically cleared of vegetation, excavated, filled, and flooded. Authorizes NMFS to conduct work related to the restoration, rehabilitation and expansion of eelgrass within the San Francisco Bay. The Corps strives to make its permit decisions in a timely manner that minimizes impacts to the regulated public. Hewitt, Floatair, Wave Port PWC & more! NAO 18-RP-02 - Dreging for navigation projects, Authorize both new maintenance dredging (channels and basins) for certain navigation related dredging projects, NAO 17-SPGP-01 - State Programatic General Permit. 659 licensed under the Federal Power Act (16 U.S.C. For website corrections, write to hqwebmaster@usace.army.mil. General Permits forJacksonville District, General Permits forPhiladelphia District, RGP-4 authorizes eleven aquatic restoration activities in waters of the United States designed to maintain, enhance, and restore watershed functions that affect aquatic species within the state of Oregon through projects implemented, funded, or overseen by USFS and/or BLM. Construction of pile-supported single family, multi-family, and single piers used at lodging facilities. RGP 11 Conduct various activities to restore and enhance the Carmel River, Monterey County (10-year RGP). Natural Resources Conservation Service Agricultural Conservation Practices. Navigable waters of the US within the boundary of the Galveston Districts Area of Responsibilities, excluding those areas located in the State of Louisiana. of Transportation Bridge Replacement Projects of Existing Crossings, GP for Oklahoma Department of Transportation bridge replacement projects. Minor Structures and Work Within the Limits of Georgia Power Company Lakes - Filling of previously dredged boat slips, artificial canals, etc. Attachments to the landward side of the dock or within the slip of a dock will not be counted toward the square footage. Box 339 Bee Spring, KY 42207-0339 Phone: 270-286-4511 Fax: 270-286-8615 E-mail: nolin@usace.army.mil Phone: 270-286-4511 E-mail: nolin@usace.army.mil A Guide for Adjacent Landowners The intent of the Nolin River Lake Shoreline Management Plan is to bal-ance use of and access to the shoreline Memphis (eastern) and Little Rock District (central and western) portions of Arkansas, Permanent Protection/Repair of Flood Damaged Structures, Damaged Lands and/or Fills (Missouri): Authorizes the excavation or placement of fill material for the permanent protection of and/or the repair of existing flood damaged structures, damaged land areas, and/or damaged fill in Missouri, Memphis (Bootheel) and St Louis District (eastern) portions of Missouri, Sand and Gravel Excavation Activities (Missouri): Authorizes the discharge of dredged and/or fill material related to mechanical sand and gravel excavation in Missouri, All of Alabama up to the Tennessee River watershed, ALGP-05 Piers, Pile-Supported Structures, and Dolphins, Piers, Pile-Supported Structures, and Dolphins, ALGP-11 Shoreline and Bank Stabilization and Protection, Shoreline and Bank Stabilization and Protection, ALGP-13 Filling of Previously Dredged Areas, ALGP-24 Piers and Pile-Supported Structures Located in Weeks Bay, Piers and Pile-Supported Structures Located in Weeks Bay, Eastern third of Mississippi from the Alabama state line west to the Pearl River watershed, MSGP-02 Docks, Piers, Wharves, Boat Shelters, MSGP-04 Mooring Pilings and Single Pile Structures, Mooring Pilings and Single Pile Structures, Alabama Power Company Lakes on the Coosa River, APCO-PGP-02 Construction of Non-Commercial Boat Slips; Maintenance Dredging of Existing Boat Slips, Canals, or Navigation Channels, Construction of Non-Commercial Boat Slips; Maintenance Dredging of Existing Boat Slips, Canals, or Navigation Channels, APCO-PGP-03 Construction and/or Maintenance of Fixed Structures, Construction and/or Maintenance of Fixed Structures, APCO-PGP-04 Construction and Modification of Boat Ramps, Construction and Modification of Boat Ramps, Alabama Power Company Lakes on the Coosa, Tallapoosa, and Black Warrior Rivers, APCO-PGP-05 Riprap for Shoreline, Bank, and Channel Protection; Bulkheads and Other Standard Shoreline Protection/Stabilization Devices Roughly Paralleling, and at the Shoreline or Bank, Riprap for Shoreline, Bank, and Channel Protection; Bulkheads and Other Standard Shoreline Protection/Stabilization Devices Roughly Paralleling, and at the Shoreline or Bank. Must have ground-fault protection at service pole. Installation/repair/relocation of water control structures; bank stabilization/repair; new interior dikes; removal of invasive plants, etc. Athorizes Public Vector Control Agencies for the maintenance of water circulation ditches and water control structures. Lake Resources > Lake Hartwell Permitting. Regional General Permit 7 - Road Crossings (Iowa). The minimum length of walkway allowed will be 16 feet. Authorizes City of Livermore for maintenance and mangment of creeks, culverts and bank stabilization for maintain flow conveyance capacity. Minor Structures and Work Within the Limits of Georgia Power Company Lakes -Submerged irrigation lines in Navigable Waters of the United States. Some of the names on the following list were provided by the Corps, but you must personally insure that the electrician you choose is State Certified. Authorizes certain activities associated with the maintenance of existing drainage ditches in tidal and other navigable waters, NAO 18-RGP-17 - Work in Navigable waters for Private use (Non-Reporting). Oilfield access roads, drilling locations, pits, ring levees, and associated facilities: Authorizes the dredging and the deposition of dredged and/or fill material for construction of oilfield access roads, drilling locations, pits, ring levees, and associated facilities in jurisdictional waters of the U.S. (WOTUS), including wetlands. ****In response to COVID 19, visitors to Corps-operated recreation areas are encouraged to follow current CDC guidelines regarding masks and social distancing. Authorizing Work and Activities in the Savannah River Lakes - debris removalfor Lake Hartwell, Lake Russell and Lake Thurmond. Minor Structures and Work Within the Limits of Georgia Power Company Lakes - Maintenance dredging of existing boat slips, canals, or navigation channels. Additionally, utility rights of way and improved walkways are now considered supporting facilities for a dock, therefore can only be permitted if a dock is authorized. APCO-PGP-07 Filling of Previously Dredged Areas Such as Boat Slips, Artificial Canals, etc. requirements are met. Authorizes activities in Waters of the United States (WOUS) related to mechanical sand and gravel excavation. RGP 88-04-WEH Maintenance of existing Flood Control Facilities, authorizes the placement of fill material in Big Papillion Creek and it tributaries for maintenance activities associated with the existing flood control and protection facility (levee), flood damage restoration (repair work), and maintenance of existing levee infrastructure into "waters of the United States, RGP 11-02-WEH (2011-2364) Flood Related Work. Oyster reef restoration/creation for harvesting, ecological restoration or experimentation. Also, this updated SMP incorporates information provided by residents, state agencies and others to set a more sustainable path for managing public land surrounding the lake, said Aaron Wahus, Operations Project Manager. RGP-11 for Construction and Operation of Exploration and Production Wells for Oil and Gas, GP for activities related to exploration and production of oil and gas, Portion of Texas within Fort Worth District, RGP for Utility Line Activiites in Critical Resource Waters in Oklahoma, GP for utility lines in critical resource waters, RGP for Transportation Crossings in Critical Resource Waters in Oklahoma, GP for transportation crossings in critical resource waters, RGP for Oklahoma Dept. Minor Structures and Activities in Portions of Lake Seminole, George W. Andrews Lake, Walter F. George Lake, West Point Lake, Lake Sidney Lanier, Carters Lake, and Altoona Lake Operated by Mobile Disctrict USACE Within the State of Georgia - Maintenance dredging of less than 5,000 cubic yards of material from existing boat slips. Minor Structures and Activities in Portions of Lake Seminole, George W. Andrews Lake, Walter F. George Lake, West Point Lake, Lake Sidney Lanier, Carters Lake, and Altoona Lake Operated by Mobile Disctrict USACE Within the State of Georgia -Construction and/or maintenance of boat shelters, gazebos, hoists, and shelters. Authority is delegated to the Savannah District, Operations Project Managers (OPMs) at the above listed Corps' lakes, to verify whether proposed work and activities in waters of the United States would meet the terms and conditions for authorization by these PGPs. At any time during the greeting, enter the extension number followed by the "#" symbol, or call them directly at the number listed below. authorizes SD dept of game, fish, and parks, to conduct bank stabilizations to prevent destruction of culturally significant sites. During the permit process, the Corps considers the views of other Federal, state and local agencies, interest groups, and the general public. Lee, Glades, Hendry, Okeechobee, Martin County, Florida, Live Rock Aquaculture in the Exclusive Economic Zone (EEZ) of Florida: to deposit materials for the purposes of live rock aquaculture into the Exclusive Economic Zone (EEZ), Ten Activities on Miccosukee Tribe Reservation Lands: up to 1.0 acre of fill for residential and 2.0 acres of fill for institutional. How long do I have to put my dock in place? Please keep your mailing address and phone numbers current. GPCO-PGP-07 Filling of Previously Dredged Areas Such as Boat Slips, Artificial Canals, etc. Authority is delegated to the Savannah District, Operations Project Managers (OPMs) at the above listed Corps' lakes, to verify whether proposed work and activities in waters of the United States would meet the terms and conditions for authorization by these PGPs. 2014-00299/Emergency Ocean Front Beach Nourishment, 2017-00756/South Carolina Department of Natural Resources General Permit, 2017-00757/South Carolina Department of Natural Resources General Permit, 2017-00758/South Carolina Department of Natural Resources General Permit, 2017-00759/South Carolina Department of Natural Resources General Permit. If the structure has a roof or upper deck, overhangs of up to 24 inches will be allowed. The. SAVANNAH, Ga. Officials from the Hartwell Dam and Lake Project recently released the latest Shoreline Management Plan (SMP) for the reservoir. Authorizes regulated activities conducted in accordance with all applicable terms and conditions of the Utility Regional General Permit (RGP or permit) in the States of Wisconsin and Minnesota and on Indian Reservations in Wisconsin and Minnesota. These 16 NWPs went into effect on March 15, 2021, and will expire on March 14, 2026. 5) Flood Protection / Reconstruction / Repair. Authorizes Chevron Products company to annually replace existingtimber fender piles and existing concretepiles at Richmond Refinery Long Wharf. NWP-2007-999/5, General Permits forSan FranciscoDistrict. All navigable waters in the Galveston District, excluding waters in Louisiana. All PWC lifts, regardless of placement on dock, must be approved. Public Transportation Projects -Construction of roads, culverts, bridges, and other structures or fills associated with improvements to all existing public transportation projects and/or with all new public transportation projects. I would like to have a two story dock, is this allowed? Authorized for an area bounded on the south and west by the existing perimeter levee, on the north by a marsh adjacent to the perimeter levee, and on the east by State Highway 124 and the 5-foot elevation contour, at the base of High Island, Galveston County, Texas. 2017-00835/Managed Tidal Impoundment General Permit. The following work is authorized under PGP 36: the addition of materials within the boundaries of and/or the expansion of Georgia DNR Artificial Reefs. Dock owners may now use solar DC power to provide electrical service to a dock. Do I need to apply for a permit if I plan on installing a boat lift or PWC lift? This is the official public website of the Savannah District, U.S. Army Corps of Engineers. Maintenance Dredging-Removal of New Silt Accumulations in the Mississippi River at Docks, Mooring Areas and Water Intake Areas: Authorizes dredging for the removal of silt accumulations around existing docks, under existing barge fleets and ship mooring areas, around existing marine launchways, and around existing intakes, and the deposition of the material in the Mississippi River generally below the minus 55-foot NAVD contour. Authorizing Work and Activities in the Savannah River Lakes - construction and maintenance of boat ramps for Lake Hartwell, Lake Russell and Lake Thurmond. Bank stabilization with onsite materials, minor channel realignments and removal of recently-formed gravel bars, Select counties in the District portion of New York State, Structures and work in waters to remediate damages as a result of a major storm event. authorizes the construction of new boat ramps, the expansion, extension and modification of existing boat ramps, construction of transfer walls and docks to service boat ramps, and protective fills immediately adjacent to proposed and existing ramps. RGP 7 Construct and improve boat docks, ramps, storm water outfall work, etc. description of the activity is needed to assure conditions of the permit . US Army Corps of Engineers 2150 Nolin Dam Road P.O. Portion of Georgia Power Company Lake Oliver and Lake Harding within Alabama, GPCO-PGP-02 Construction of Non-Commercial Boat Slips; Maintenance Dredging of Existing Boat Slips, Canals, or Navigation Channels, GPCO-PGP-03 Construction and/or Maintenance of Fixed Structures, GPCO-PGP-04 Construction and Modification of Boat Ramps. Deliver vital engineering solutions, in collaboration with our partners, to secure our Nation, energize our economy, and reduce disaster risk. All plans for new docks and modifications to existing docks, including walkways, must be approved by a state licensed structural engineer to ensure a quality, safe design suitable for conditions on the Hartwell Project. Lake Hartwell is owned and managed by the US Army Corps of Engineers. For questions regarding this issue, please call the Hartwell Lake Office at 706-856-0300. Permit triggered by national or state flood disaster declarations for recovery and restoration activities. Authorizes living shorelines, riprap revetments, bulkheads, breakwaters, groins, jetties, spurs, baffles, aquaculture activities and boat ramps, NAO 17-RGP-20 - Artificial Reef Construction and Maintenance, Authorizes activities associated with construction or mainenance on certain state owned, operated, or managed artificial reefs, Authorizes specific activities within the Virginia portion of Lake Gaston, RGP 98-05-WEH Manmade Lakes and ponds maintenance and rehabilitation. Minor Structures and Activities in Portions of Lake Seminole, George W. Andrews Lake, Walter F. George Lake, West Point Lake, Lake Sidney Lanier, Carters Lake, and Altoona Lake Operated by Mobile Disctrict USACE Within the State of Georgia - Mooring pilings and dolphins. Authorizes work and discharges of fill necessary for the repair and protection measures associated with an emergency situation. Walkway width may vary from a minimum of 3 feet to a max of 6 feet. City of Superior (WI) Special Area Management Plan (SAMP)- Residential Programmatic General Permit. This is the official public website of the Headquarters U.S. Army Corps of Engineers. Bank Stabilization: Authorizes activities proposed by the public, railroads, transportation departments, pipeline and utility companies, and government agencies for bank stablization activities, All State of Illinois counties EXCEPT Cook, DuPage, Kane, Lake, McHenry, and Will counties, Minimal Impact Activities within the plan area of the East Contra Costa County Habitat Conservation Plan / Natural Community Conservation Plan, RGP 3 - Boat Docks and Associated Structures, RGP 7 - Construction and Maintenance of Flood Control Facilities under the Clark County Regional Flood Control District Master Plan, Construction and Maintenance of Flood Control Facilities under the Clark County Regional Flood Control District Master Plan, RGP 8 - Emergency Repair and Protection Activities, RGP 9 - Minor Discharges Associated with the Sacramento Municipal Utility District's Upper American River Project, Minor Discharges Associated with the Sacramento Municipal Utility District's Upper American River Project, RGP 13 - Natural Disaster Mitigation and Flood Related Activities in Colorado, RGP 14 - Placer Vineyards Specific Plan Infrastructure, Placer County, California, Placer Vineyards Specific Plan Infrastructure, Placer County, California, RGP 15 - Minimal Impact Activities Conducted Under the South Sacramento In-Lieu Fee Program, Minimal Impact Activities Conducted Under the South Sacramento In-Lieu Fee Program, RGP 16 - Anadromous Salmonid Fisheries Restoration, Anadromous Salmonid Fisheries Restoration, California Central Valley, Delta, and Suisun Bay, RGP 37 - Stream Stabilization Projects In Western Colorado, Stream Stabilization Projects In Western Colorado, PGP 10 - Minimal Impact Activities Authorized in Conjunction with the State of Utah's Stream Alteration Program, Minimal Impact Activities Authorized in Conjunction with the State of Utah's Stream Alteration Program, PGP 17 - Minimal impact covered activities under the South Sacramento Habitat Conservation Plan, Minimal impact covered activities under the South Sacramento Habitat Conservation Plan, RGP 3 Conduct activities related to waterfowl hunting and management. Authorizes placement of dredged or fill materials impacting a cumulative maximum of 15.0 acres of wetlands identified for public facilities in accordance with the City of Superior Special Area Management Plan (SAMP) and City of Superior zoning code or ordinances. Placement of Materials at Approved Offshore Artificial Reef Sites in the Atlantic Ocean -Corps delegates authority to the Georgia DNR to verity that work proposed under PGP 36 qualifies for authorization under PGP 36.